Projects

Let the images speak

Hilton Garden Inn

Holly Eyewear

Finch Avenue Optometry

Chrysler Fiat

Residential Projects

What We’ve Done in the Past

Construction Management services for other Employers

HOSPITALITY:

  • Hilton Homewood Suites Hotel, Oakville
  • Hilton Homewood Suites Hotel, Cambridge
  • Staybridge Suites, London
  • Hilton Hampton Inn, London


RETAIL & COMMERCIAL:

  • Chrysler Fiat, Hamilton
  • Rose City Chrysler, Welland
  • Shoppers Drug Mart Base Building, Beamsville
  • Finch Optometry, North York

INSTITUTIONS & POST SECONDARY:

  • Burnt Elm Elementary School, Bramptonv
  • Mount Carmel Secondary School Addition, Mississauga
  • St. Raymond’s Elementary School, Mississauga
  • Queens University – Integrated Learning Facility - Smith Falls Collegate, Smith Falls


HOSPITALS & LONG TERM FACILITIES:

  • St. Michael’s Hospital Addition – 12th To 18th Flr Victoria Wing, Sunnyside Home Redevelopment, Waterloo

Holly Eyewear

Built in the core of Toronto's fashion district of Yorkville, this 2500sf retail store has already made it in many fashion magazines for its design and Eyewear. Once the suite was completely demolished to its base build state, this 1940 built building was transformed to a contemporary store. Upon making the interior perimeters plumb, high end finishes were applied to suit it's neighbourhood and clientele. The project was fast-tracked and completed with 2 months.

Toronto, ON

Project was completed on July 2015

Construction Management Services

Finch Avenue Optometry

Winning an Award for 2015 Design Excellence by ARIDO, this Project was construction managed, from start to finish by Mike Bozzelli while employed at Defaveri Group Contracting. This 5000sf contemporary building is a state of the art structure in North York, Ontario. Either constructing on a busy Finch Ave. road, or fabricating and installing a 10 tier LED wrapped ceiling feature in a 22ft high dispensery, every corner of this building speaks modern design. This project opened its doors after 8 months of construction.

Toronto, ON

Project was completed on September 2013

Construction Management Services

Chrysler Fiat

This 3000sf new build was construction managed by Mike Bozzelli while employed with DeFaveri Group Contracting. While bringing a little Italian into Hamilton but prior to its construction, the creek that resided below the future building was required to be decommissioned. In 4 months, Johnston Fiat opened its doors to the public.

Hamilton, ON

Project was completed on September 2012

Construction Management Services

Hilton Garden Inn

Under the construction management delivery model, this challenging and exciting project brings the addition of 30 new suites onto this existing 4 storey hotel. Once the existing wood roof trusses are removed, 14000sf of CFSJ (cold formed steel joists) will be used to construct the superstructure followed by a traditional construction assembly. Once completed, this hotel will have a modern and fresh appeal bringing the hotel to Hilton's new standards.

Oakville, ON

Project would be completed on September 2016

Construction Management Services

Residential Projects

From a simple ensuite bathroom and through to a major renovation, BOZZ BUILT has managed many breathless residential projects. Along with the excitement of managing professional subcontractors, many projects involved the client residing within their dwelling during construction. BOZZ BUILT takes all procautions and control measures for dust and safety to ensure the transformation is a flawless experience.

Ontario

Various Projects

Construction Management Services